Cambiar divisa: USD

Cambiar idioma: DeutschDanskEnglish (UK)English (US)Español

D122L dual battery harness with long leads

$16.00

Nivel de stock: 3

Información de producto

D122 Dual Battery Harness with long leads for extended standby battery capacity.  Includes built in circuit breaker to protect against battery failure or incorrect connection. Leads for one battery are approximately 2 1/2 ft long, the second battery lead is about 3 ft long.  These are designed for mounting larger batteries in a secondary enclosure.  

NOS with 1 year warranty

Picture for illustration only, the one you will get has longer leads than the one in the pic.

Código de producto: D122L

Opiniones de clientes

No se ha opinado todavía sobre este producto. Escribir una opinión

 

eCommerce by CubeCart